Intersono is working in full output after the summer holiday. The proof is our part in construction of the concert hall in a yard of Prague conservatory, in the very heart of our capitol in Old city by Vltava river.
Our supply represents 4 lited stage tables: 21 m2, 15 m2 and 4×2,5 m2 lifted 0.8 m above the stage level. The system is operating with our well established technology Serapid LinkLift from french producer. For this extraordinary project, when the unused empty yard of the bulding will be transformed to concert hall, we supply the framework of the stage, auditorium and balcony.