One of our latest realizations, the construction of concert hall in a yard of Prague conservatory, was inaugurated and opened to wide public during the gala concert.
On that concert during 9th and 10th of March 2011 appeared:
Our supply represented 4 lifted stage tables: 21 m2, 15 m2 and 4×2,5 m2 lifted 0.8 m above the stage level. The system is operating with our well established technology Serapid LinkLift. For this extraordinary project, when the unused empty yard of the bulding will be transformed to concert hall, we supplied the framework of the stage, auditorium and balcony as well.